Skip to content

A flat roof method statement that matches the roof you're covering.

Describe the flat roof, from a felt repair on a garage to a full warm-roof strip and re-cover. You get a method statement and risk assessment back, with hot works, fragile surfaces and edge protection built in.

First document free, then £15 each. No subscription.HSE five steps · CDM 2015

What it covers

The sequence for stripping the old covering, checking the deck, laying insulation and applying the new membrane. It records the edge protection and access in place before work starts, how LPG cylinders are stored and checked, and the fire watch kept after the last flame each day.

Hazards and controls

Falls from the roof edge, controlled by scaffold or guardrails before anyone goes up. Falls through a fragile or rotten deck, controlled by checking the deck and boarding across weak areas. Fire from torch-on work, controlled by a hot works permit, a cold-applied system where the specification allows, and a fire watch. Then LPG leaks, burns, falling debris and manual handling of rolls and boards. Controls follow the hierarchy, so edge protection and the permit come before PPE.

Permits and competence

Torch-on roofing needs a hot works permit issued each day before any flame is lit. The method statement names the permit, the roofing qualifications and the LPG training required, so a principal contractor can check it at a glance.

FAQ

Does it cover hot works for torch-on membranes?
Yes. The hot works permit and the fire watch are part of the numbered method, and fire is in the risk assessment with the matching controls.
Does it cover fragile roofs?
Yes. Checking the deck before work is a step in the method, and a fall through a fragile surface is in the risk assessment.
Can I add my own steps?
Yes. Download it as Word and edit anything to match the roof, the membrane and the access you are using.
What does it cost?
Your first document is free. After that, £15 each, three for £35, or ten for £89. No subscription. You can read a full sample before you decide.

Guides and templates

Get your RAMS in minutes.

Get your RAMS– it's freeFirst document free, then £15 each. No subscription.