What it covers
The sequence for removing the old frame, preparing the opening, fitting and fixing the new window, and sealing it. It records the access used at each floor, how the opening is kept guarded while it is empty, and how glass and old frames are carried and removed.
Hazards and controls
Falls from towers or scaffold, controlled by guardrails and trained users. Falls from an open first-floor opening inside the house, controlled by keeping the opening guarded and people away from it. Broken glass and heavy sealed units, controlled by suction lifters and two-person lifts. Then silica dust from drilling fixings, falling objects onto the footway, and asbestos in old window boards and panels. Controls follow the hierarchy, so guarding and lifting aids come before PPE.
Competence and registration
Window installation needs competent fitters with PASMA training for towers. Replacement windows also need Building Regulations compliance, often shown through a competent person scheme such as FENSA. The method statement names the competence required, so a client or principal contractor can check it at a glance.
FAQ
- Does it cover open window openings?
- Yes. Guarding the opening while it is empty is part of the numbered method, and a fall from the opening is in the risk assessment.
- Can I add my own steps?
- Yes. Download it as Word and edit anything to match the windows, the access and the property you are working on.
- Will it be accepted on site?
- It follows the HSE five steps and the CDM 2015 framing site managers expect. A competent person still has to review and sign it off before use.