| Fall from height from the roof, the roof edge, the scaffold lift or the ladder bay while stripping and torching | The two operatives, who could suffer fatal or disabling injuries from a fall | Independent scaffold with double guardrails at eaves level, ladder access bay and scaffold handover certificate. Work at Height Regulations 2005 apply. | 3×5=15 | Avoid working at height where possible: assemble and cut materials at ground level. Check the handover certificate and that the scaffold has been inspected within the last 7 days and after any bad weather (Work at Height Regulations 2005). Keep edge protection and toe boards in place at all times and do not remove or alter them. Keep the working platform clear of tools, hoses and stacked materials. Use the ladder bay only for access and keep the access clear. No work in high winds or wet, slippery conditions. Brief both operatives on edge protection and the rescue plan. Sound footwear with good grip is the last line of defence. | Medium |
| Fall through a fragile, weak or failed roof deck or an existing rooflight; overloading the deck with stacked materials | The two operatives, from falls through the roof into the garage/kitchen extension | Competent operatives experienced in flat roof stripping. Work at Height Regulations 2005 apply. | 3×5=15 | Check the deck condition from the scaffold before stepping onto the roof and test as the covering is lifted. Mark and guard any rooflights, rot or soft areas. Use crawl boards or spreader boards where the deck is doubtful. Limit stacked materials to small piles spread over the supports and keep them away from weak areas. Strip in small sections, never the whole roof. Stop and tell R. Whitfield if the deck is unsound. Do not carry on until it has been repaired or made safe. | Medium |
| Hot works with a propane torch: fire from the flame, heat or sparks reaching roof timbers, eaves, soffits, fascias, cavities, PIR boards or the kitchen/garage below | Operatives, Mr & Mrs Ashford, any household members, neighbours and the building itself, with risk of fatal burns and smoke inhalation | Hot works permit issued daily. Operatives trained in LPG and hot works. | 3×5=15 | Consider whether a cold-applied, self-adhesive or mechanically fixed method is suitable for details near timber; torch only where needed and only as the system manufacturer allows. Follow NFRC Safe2Torch guidance. Clear combustibles from the roof and the area around it. Shield or protect timber edges, eaves and vents with non-combustible shielding. Keep the flame on the roll and substrate only and away from the roof edge and timber. Do not torch while the primer is still wet. The permit is checked and signed before any flame is lit each day. Two charged extinguishers at roof level. A second person acts as fire watch whenever the torch is lit. A fire watch of at least 60 minutes (or longer if the permit says so) after the last flame, with checks at the eaves, upstands and ceiling below. No flame in wind that blows it at timber or at the edge. Flame-retardant or natural-fibre clothing is the last line of defence. | Medium |
| LPG (propane) cylinders, regulators and hoses: gas leak, hose damage, flashback, cylinder falling or overheating | Operatives, occupants and neighbours, with risk of fire, explosion and serious burns | Operatives LPG-trained. Propane torch and hoses in use. Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR) apply to the flammable gas. | 2×5=10 | Take only the cylinders needed for the day. Keep the cylinders upright and secured at ground level or on the scaffold boards, never left on the roof overnight and away from the building, drains and ignition sources. Use equipment that is in date, with regulator, hose clips and a flashback arrestor. Check hoses for cuts and wear before each use and replace damaged ones. Leak test every joint with a proper leak detection solution after connecting. Route hoses clear of walkways and edges and secure them. Close the cylinder valve at every break and at the end of the day. Brief both operatives on what to do in a leak or fire. Heat-resistant gloves are the last line of defence. | Medium |
| Burns from the torch flame, hot membrane, hot bitumen and heated surfaces | Both operatives, with risk of painful burns that need hospital treatment | Trained operatives, one working the torch and one assisting. | 4×3=12 | Plan the torch work so the operative works backwards away from the heated area and does not kneel or lean on hot membrane. Set down the torch only in a safe place with the valve closed. Allow the membrane and tools to cool before handling. Keep a burns kit and a water supply to hand and brief both operatives on burns first aid. Rotate the torch task to limit tiredness. Heat-resistant gloves to EN 407, long-sleeved clothing and safety boots are the last line of defence. | Medium |
| Occupied site: the household of Mr & Mrs Ashford, their family, pets and visitors in the house and garden next to the work. Risk of smoke and fume entering the kitchen, falling objects, rain water coming through the opened roof, and unauthorised access to the scaffold. | Mr & Mrs Ashford, any children, pets and visitors, who could suffer smoke inhalation, burns, falling debris or slips on a wet floor | Client WC by arrangement. Scaffold and edge protection in place. Daily hot works permit. | 3×4=12 | Agree the work zone and the exclusion zone on the pre-start walk and keep the occupants out of the garden work area and off the scaffold. Barrier and sign the exclusion zone. Ask the occupants to keep windows, doors and vents near the work closed and to tell us at once if they smell smoke. Check that smoke alarms are working. Strip only the area that can be made watertight the same day and cover the deck at the end of each day. Keep tools, materials and LPG cylinders locked away or out of reach when we are off the site. Brief the occupants on the fire assembly point. Keep the occupants informed of the daily plan. | Low |
| Public and other trades nearby: passers-by on the pavement or neighbouring gardens, the scaffold contractor and any other trades at the property, with dropped tools, debris or heat reaching them | Neighbours, passers-by, children, the scaffolders and any other trades, who could be hit by falling items or be affected by sparks, heat or fumes | Scaffold with edge protection and toe boards. Exclusion zone planned. | 3×4=12 | Keep an exclusion zone around the scaffold on the ground, with barriers and signs, and keep the public out. Use a debris chute or covered skip so nothing is thrown. Consider the side of the roof next to the neighbour's boundary and keep the flame and heat shielded away from it. Tell the other trades the times of hot works and keep them clear of the work area. No one works under the roof while stripping or torching is going on. Keep the access route clear. If a member of the public enters the zone, stop work until they have left. | Low |
| Falling objects and debris while stripping: old felt, insulation, tools, fixings and offcuts dropped from the roof | People on the ground below, operatives on the scaffold and anyone in the garden, with risk of head and other injuries | Scaffold toe boards. Exclusion zone planned. | 3×4=12 | Bag or bundle the waste on the roof and lower it by chute or in bags, never throw. Keep tools in a tool belt or tethered and keep small items off the roof edge. Do not stack materials against the guardrails. Clear the area beneath the roof before work starts and keep it clear with barriers. A hard hat (EN 397) is the last line of defence for anyone entering the zone. | Low |
| Disturbing unidentified asbestos-containing materials when stripping the existing roof covering and deck, in a building whose age or survey status has not yet been confirmed | Operatives, occupants and neighbours, with risk of long-term lung disease from breathing in fibres | Asbestos is not flagged for this job. The building age and survey status are to be confirmed on the pre-start walk. | 2×5=10 | Before work starts, check the client's asbestos register or management survey for the roof area, and confirm the building age. If the register does not cover the area, or the building is pre-2000 or its age is not known, a refurbishment and demolition survey of the area is needed first (Control of Asbestos Regulations 2012, Regulation 5). Stop-work rule: if any suspect material is found, stop, keep people away and report to R. Whitfield and the client before carrying on. Do not break, drill or sweep suspect material. This is a check to be made, not a finding. | Medium |
| Fumes and dust: bitumen fume from the torch, primer vapour, PIR cutting dust and dust from stripping the old covering | Operatives and anyone downwind, including occupants through open windows and vents, with irritation of eyes, nose, throat and skin | Work is carried out in the open air. COSHH assessments are in this RAMS. | 4×3=12 | Follow the Control of Substances Hazardous to Health Regulations (COSHH) 2002. Where the system manufacturer allows, use a low-solvent or water-based primer. Torch only as much as needed and avoid overheating the membrane. Work upwind and keep others downwind. Cut PIR in the open air and clean up with a vacuum, never dry sweeping. Ask occupants to keep windows near the work closed. Take breaks away from the torch. Gloves, eye protection and the RPE the Safety Data Sheet specifies are the last line of defence. | Low |
| Manual handling of membrane rolls, PIR boards, tins of primer, cylinders and waste bags to and from roof level | Both operatives, with risk of back and shoulder injury or dropping loads | Two operatives. Manual Handling Operations Regulations 1992 apply. | 4×3=12 | Avoid carrying by hand up the ladder: use a hoist or other agreed lifting method, and if a hoist or gin wheel is used it must be in date for thorough examination and used to its limit (Lifting Operations and Lifting Equipment Regulations 1998). Order materials in manageable sizes and deliver as close as possible to the scaffold. Two-person lifts for rolls and large boards. Limit loads and take rest breaks. Keep the route clear. Gloves and safety boots are the last line of defence. | Medium |
| Weather: heat and UV in June, rain and wind, wet and slippery membrane and deck | Both operatives, with risk of heat illness, slips on the roof and wind blowing the flame or sheets | Forecast checked. Work stopped in rain. | 3×3=9 | Check the forecast each morning and agree a stop point. No torching in rain or wind that moves the flame or lifts the sheets. Start early in hot weather, take breaks in the shade and keep drinking water to hand. Cover the roof before rain. Do not walk on wet membrane. Sun protection, sun cream and sound footwear with good grip are the last line of defence. | Low |
| Cuts from hook blades, knives, the PIR cutter and old fixings or nails when stripping | Both operatives, from cuts to hands and legs | Competent operatives using hand tools. | 4×2=8 | Use retractable or guarded blades and cut away from the body. Replace blunt blades and dispose of used ones in a sharps container. Remove or flatten old fixings as the covering is lifted. Keep the work area tidy. Cut-resistant gloves to EN 388 are the last line of defence. | Low |
| Slips, trips and falls on the same level: hoses, tools, offcuts, loose membrane and uneven upstands on the roof and scaffold | Both operatives, from sprains, bruises and, near an edge, a fall | Scaffold boards, toe boards and guardrails. Competent operatives. | 4×3=12 | Plan the layout so hoses and cables run along the edges and away from walkways, and keep the roof clear of offcuts and waste. Bag waste as it is made. Keep the ladder bay and the walkways clear. Keep the stairs and access route to the vehicle clear. Safety boots with good grip are the last line of defence. | Low |
| Existing roof penetrations and services: flues, vents, extractor outlets, soil pipes, rainwater outlets and any electrical cables or fittings at roof level | Operatives and occupants, from fire, fume entry, blocked flues or electric shock if a cable is damaged | Roof walked and checked before stripping. | 2×4=8 | Identify and mark every penetration and any cable on the pre-start walk. Ask Mr & Mrs Ashford to turn off or avoid using any appliance that vents through the roof during torching. Do not cut into or strip around any cable or flue until it has been identified and made safe (Electricity at Work Regulations 1989). Protect outlets and vents from the flame. Protect rainwater outlets from debris. Report any damage to the client. | Low |