Sample · First-fix carpentry
First-fix carpentry RAMS example
You write this
First-fix carpentry to a new-build plot under construction: install floor joists, erect timber stud partitions and fit door linings, working from open floor edges and the leading edge.
You get this
First-fix carpentry to Plot 14 at Willowbrook Grange, Nottingham NG12 3H**, for Kestrel Homes as Principal Contractor. Works comprise installing floor joists to the first floor, erecting internal timber stud partitions and fitting door linings, on a new-build plot under construction. Operatives work from open floor edges and the leading edge of the floor as joists are laid. Carried out in accordance with CDM 2015 and the Work at Height Regulations 2005, under the Principal Contractor's site rules.
| Contractor | Timberline Carpentry Contractors Ltd |
|---|---|
| Author | J. Whitaker, Lead Carpenter (NVQ Level 3, CSCS Gold) |
| Client / Principal Contractor | Kestrel Homes (Principal Contractor) |
| Site | Plot 14, Willowbrook Grange, Willowbrook Grange, Nottingham NG12 3H** |
| Project reference | TCC-4420 |
| Start / duration | Tue 23 Jun 2026 / 5 days |
1. Scope of works
First-fix carpentry to Plot 14 at Willowbrook Grange, Nottingham NG12 3H**, for Kestrel Homes as Principal Contractor. Works comprise installing floor joists to the first floor, erecting internal timber stud partitions and fitting door linings, on a new-build plot under construction. Operatives work from open floor edges and the leading edge of the floor as joists are laid. Carried out in accordance with CDM 2015 and the Work at Height Regulations 2005, under the Principal Contractor's site rules.
2. Sequence of works
Method statement, safe system of work
- Operatives sign in with the Principal Contractor, attend the site induction and review this RAMS and the day's task with the site manager.
- Confirm the Principal Contractor's edge protection, working platforms and access scaffold are in place, inspected and tagged before starting work at height.
- Inspect the work area, access routes and the structure below; confirm the floor zone is cordoned off beneath where leading-edge work will take place.
- Set out and check materials, keeping timber stacked stably and clear of access routes and floor edges.
- Establish a designated cutting station in a well-ventilated area with the mitre/circular saw connected to on-tool dust extraction.
- Set out the floor joist positions from the drawings and fix joist hangers to the supporting structure.
- Lay and fix the floor joists, working back from a protected position towards the leading edge and never standing on unfixed joists.
- As joists are laid, install temporary edge protection or work within the Principal Contractor's guardrails at all open floor edges; do not work at an unprotected edge.
- Lay temporary boarding / decking over the joists to form a safe working surface before proceeding across the floor.
- Fix noggins and strutting between joists to stabilise the floor, cutting timber at the extraction-fitted cutting station.
- Set out the stud partition positions and fix the sole plates and head plates to the floor and structure.
- Cut and fix the vertical studs and noggins to form the partitions, using the first-fix nail gun with the safety controls engaged.
- Position and fix door linings plumb and square within the stud openings, packing and fixing as required.
- Keep the working area clear of offcuts and swept as work proceeds, removing trip hazards from floor edges and access routes.
- Empty on-tool dust extraction and dispose of wood dust and offcuts into the correct waste stream, not left to accumulate.
- On completion of each area, check fixings, remove tools from floor edges and make the area safe before leaving.
- Report any damaged or removed edge protection to the Principal Contractor immediately and do not use the area until reinstated.
- Carry out a final inspection of the first-fix works against the drawings and hand over to the site manager.
- Clean the work area, return tools to secure storage, and confirm no offcuts or fixings are left at floor edges.
- Sign out with the Principal Contractor.
3. Risk assessment
HSE 5-STEP · MHSWR 1999 REG 3 · HIERARCHY OF CONTROL
| Hazard | Who / how | Existing controls | L×S | Additional controls | Residual |
|---|---|---|---|---|---|
| Fall from height at open floor edges, floor voids and the leading edge while installing joists. | Carpenters. Falls from height causing fractures, serious injury or fatality. | Principal Contractor edge protection and access scaffold in place. Inducted, competent operatives. | 3×5=15 | Follow the Work at Height Regulations 2005 hierarchy: work within the Principal Contractor's guardrails/edge protection at all open edges and cover or barrier floor voids. Lay temporary boarding to form a safe surface before crossing joists; never stand or walk on unfixed joists or at an unprotected leading edge. Where a residual fall risk remains at the leading edge, use a fall-arrest harness to a suitable anchor as a last resort. Stop and report any missing or damaged edge protection before continuing. | Medium |
| Injury from the first-fix nail gun (nailer) — puncture wounds, unintended discharge, or nails penetrating hidden hands/services. | Carpenters and nearby operatives. Puncture injuries, serious hand/eye injury. | Nail-gun trained operatives. Tools maintained and inspected before use. | 3×3=9 | Use the nail gun in accordance with PUWER 1998 and the manufacturer's instructions: keep the sequential trip / safety contact engaged, never bypass it, and never carry the tool with a finger on the trigger. Keep the free hand clear of the firing line and never fire towards another person. Disconnect the gas cell / battery before clearing a jam or leaving the tool. Wear eye protection. Check for hidden studs/services before firing into an unseen face. | Low |
| Contact with rotating blades of circular and mitre saws, and other power tools. | Carpenters. Severe lacerations, amputation, eye injury from ejected material. | Abrasive wheels / power-tool trained operatives. Guards and riving knives fitted. Tools inspected before use. | 2×4=8 | Use saws per PUWER 1998 with blade guards, riving knife and the correct sharp blade fitted; never remove or wedge back the guard. Cut only at the designated cutting station with the workpiece clamped or firmly supported, keeping hands clear of the blade line and using a push stick where appropriate. Isolate the tool before changing blades or clearing offcuts. Wear eye protection. Only trained operatives use the saws. | Low |
| Exposure to wood dust from cutting softwood timber (COSHH — respiratory sensitisation, occupational asthma). | Carpenters and nearby operatives. Respiratory irritation, asthma, long-term ill health. | Cutting kept to a designated station. General site ventilation. | 3×3=9 | Control wood dust under COSHH 2002 (softwood dust has a Workplace Exposure Limit): use on-tool LEV / dust extraction (M-class or better) at source on the saws. Cut in a well-ventilated area, not enclosed spaces. Clear settled dust with a vacuum, never dry-sweeping or airline. Wear FFP3 disposable respiratory protection (face-fit tested) when cutting. Empty extraction into sealed bags. Health surveillance for regular timber-cutting operatives. | Low |
| Manual handling of timber joists, studwork, door linings and material stacks. | Carpenters. Musculoskeletal injuries to the back, shoulders and hands. | Manual handling trained operatives. Materials distributed close to the work face. | 3×2=6 | Comply with the Manual Handling Operations Regulations 1992: assess loads, team-lift long joists and heavy linings, keep loads close and avoid twisting. Use mechanical handling / the site hoist to move materials to the working level rather than carrying up stairs. Break loads down where possible, store stably at working height, and keep access routes and floor edges clear of stacked timber. Wear gloves against splinters. | Low |
| Noise from power tools and nail guns, and hand-arm vibration from prolonged tool use. | Carpenters and nearby operatives. Noise-induced hearing loss; hand-arm vibration syndrome (HAVS). | Low-vibration cordless tools where available. General awareness of exposure. | 3×3=9 | Control noise to the Control of Noise at Work Regulations 2005: wear hearing protection during sawing and nailing and reduce exposure by cutting away from others. Control vibration to the Control of Vibration at Work Regulations 2005: use well-maintained, low-vibration tools, limit trigger time, rotate cutting tasks between operatives, and keep hands warm. Operatives briefed on HAVS symptoms and included in health surveillance where trigger times approach the exposure action value. | Low |
| Slips, trips and falls over offcuts, materials, trailing leads and uneven surfaces. | Carpenters and other trades on the plot. Sprains, fractures; a trip near a floor edge could cause a fall from height. | General site tidiness. Materials set out to one side of access routes. | 3×3=9 | Keep the work area tidy and clear offcuts and fixings as work proceeds, with particular attention to floor edges and access routes. Route power leads away from walkways and off the floor where possible; use cordless tools to reduce trailing leads. Maintain clear, lit access and egress. Store timber in stable stacks clear of routes. Report and clear any spillages or debris left by other trades. | Low |
4. Plant & equipment
- Cordless circular saw (guard and riving knife fitted)
- Mitre saw (chop saw) with on-tool dust extraction
- First-fix nail gun / nailer (gas or cordless, sequential trip)
- M-class dust extractor / on-tool LEV
- Cordless drill/driver and impact driver
- Hand tools (hammers, chisels, hand saws, squares, levels)
- Temporary edge protection and floor decking (as agreed with the Principal Contractor)
- Site hoist / mechanical handling for lifting materials to level (by Principal Contractor)
5. Materials / COSHH
The principal COSHH hazard is wood dust from cutting softwood timber, which is a respiratory sensitiser with a Workplace Exposure Limit and is controlled by on-tool LEV, FFP3 RPE and vacuum clean-up rather than dry-sweeping. Timber preservative-treated components and any construction adhesives/sealants used to fix linings are used per their Safety Data Sheets, with gloves and ventilation. No hazardous substances beyond these are introduced. Gas cells for the nail gun are stored and handled per the manufacturer's instructions, away from heat and ignition sources.
6. PPE
- Safety helmet
- Safety footwear with steel toe and midsole penetration protection
- High-visibility clothing
- Eye protection (when cutting, nailing and drilling)
- FFP3 disposable respirator, face-fit tested (when cutting timber)
- Hearing protection (during sawing and nailing)
- Gloves (splinter and cut protection during handling)
7. Competence & training
All operatives hold valid CSCS cards and are qualified carpenters (NVQ Level 3). Operatives are trained in the safe use of the nail gun and abrasive/power saws, in manual handling, and in working at height. Face-fit testing is in date for the FFP3 respirators used during timber cutting. J. Whitaker (Author) is the Lead Carpenter, responsible for the task briefing, checking edge protection before work at height and supervising the first-fix works under the Principal Contractor's site rules.
8. Permits
- Principal Contractor permit to work / task briefing sign-off before starting on the plot.
- Work-at-height area sign-off confirming edge protection is in place and inspected.
9. Access & egress
Access to the working level is via the Principal Contractor's site scaffold and staircase, kept clear of materials and offcuts. Work at open floor edges is only carried out within the Principal Contractor's edge protection or temporary guardrails; floor voids are covered or barriered. Temporary boarding is laid over joists to form a safe walking surface. Emergency egress routes are kept clear at all times and any damage to access or edge protection is reported to the Principal Contractor before work continues.
10. Welfare
Welfare is provided by the Principal Contractor: WC and wash-hand facilities, a canteen/mess area and a drying room. Operatives wash hands before eating, particularly after handling treated timber and adhesives. Drinking water is available on site. Rest breaks are taken in the welfare area, away from the work at height and cutting areas.
11. First aid
First aid is provided under the Principal Contractor's site arrangements, with the site first aider and the stocked first aid station location confirmed at induction; the company vehicle also carries a first aid kit. Serious injury or a fall from height: call 999, give the site address, do not move a casualty with a suspected spinal injury unless in further danger, and follow the site emergency plan. Where a fall-arrest harness is used, a rescue plan is in place to recover a suspended person promptly and avoid suspension trauma.
12. Emergency procedures
On hearing the site alarm, stop work, make tools safe and evacuate to the Principal Contractor's assembly point for a roll call. In the event of a fall from height or serious injury, stop work, make the area safe, administer first aid and call 999. In the event of a fire, do not tackle it beyond a first-aid fire response, evacuate and call 999. Damaged or removed edge protection is treated as an emergency: prohibit access to the area until it is reinstated. Report incidents to the Principal Contractor and, where reportable, under RIDDOR.
13. Environmental
Wood dust and offcuts are collected and segregated for recycling or the correct waste stream, not allowed to blow around the site or block drains. Timber deliveries are planned to reduce packaging and vehicle movements, and packaging is segregated for recycling. Treated-timber offcuts are disposed of correctly, not burned on site. Noise from cutting and nailing is minimised and kept within the Principal Contractor's site hours. Spent gas cells and battery packs are disposed of as directed, not in general waste.
This document was AI-generated as a drafting aid. It is not a substitute for professional health & safety advice. It must be reviewed, verified and made site-specific by a competent person before use, briefed to all operatives, and updated when site conditions or the method change. The provider accepts no liability for use of this document on site.
Want one like this for your job?
First document free. Then £15 each, or three for £35. No subscription.
Get my RAMS